Using arithmetic and geometric progressions work out the following:
An oil rig drills to a depth of 1000metres. Estimate the cost of drilling if the first metre costs £200, with an increase of £22 for each further metre drilled.
Using arithmetic and geometric progressions work out the following:
An oil rig drills to a depth of 1000metres. Estimate the cost of drilling if the first metre costs £200, with an increase of £22 for each further metre drilled.
No answers have yet been posted. Add your answer to this question.