What’s the notice during the operation of MG Double Girder Gantry Crane?

Posted 3+ months ago | 2 answers | 1 star | Open

Related topics: notice, crane, double, girder

Response posted by nucleoncrane 3+ months ago: Precautions: At the job site, when the MG double-girder gantry crane stops working, the user should lock the crane in time. There are no wires above the main switch of the crane. It is strictly forbidden to be used for dangerous operations such as lifting high-temperature molten liquid, flammable, d ...

How to use Gantry Crane??

Posted 3+ months ago | 2 answers | 1 star | Open

Related topics: crane

Answer posted by nucleoncrane 3+ months ago: Precautions for Gantry Crane Operation: 1. After the operation (assembly) of the gantry crane is completed, a load trial hoisting should be carried out; the trial hoisting is divided into static load and dynamic load, and the operating capacity, carrying capacity, stability and reliability of each ...

How to choose single girder or double girder for gantry crane ?

Posted 3+ months ago | 2 answers | 1 star | Open

Related topics: single, crane, double, girder

Response posted by nucleoncrane 3+ months ago: Selection of single-girder crane and double-girder gantry crane In general, the lifting capacity is less than 50t, the span is within 35m, and there is no special requirement for use. The single main girder type should be selected. If the door leg width is required to be large, the working speed is ...

How do cranes lift heavy loads?

Posted 3+ months ago | 3 answers | | Open

Related topics: heavy, crane, lift, load

Response posted by nucleoncrane 3+ months ago: So how does the crane work? The main work is divided into four items, namely lifting, running, bluffing, and rotating. "Lifting" means lifting heavy objects, which can meet the requirements of heavy objects for vertical lifting. As the most basic item in crane work, it is the soul ...

How do you think of the automation of industrial cranes?

Posted 3+ months ago | 2 answers | 1 star | Open

Related topics: crane, industrial, automation

Response posted by nucleoncrane 3+ months ago: Automated intelligent cranes have an important influence on the development of cranes at this stage, are an important foundation for enterprise development and implementation of production work, and have an irreplaceable position in industrial production. Therefore, in the actual development ...